The attached drawings describe the proper positioning of Activa relative to the car wash bay, the site wiring required prior to Activa installation, and how that wiring is connected to Activa during the installation process.
Receiving and Preparing Activa at Warehouse The attached drawings show Ryko's process for receiving and prepping Activa for reshipment to the customer site. Details of crate opening, logo and legend...
Bill Dispenser Maintenance The Bill Dispensers must have routine maintenance to avoid continuous jams and to speed up the process of switching dispensers. The sensors, belts, and rollers get dirty...
Activa Service Manual - Draft Attached is a draft copy of the Activa Service Manual, which includes Installation, Operator and Service manual material. Please review for content and...